INV Ref – PRXRALF5

41

3658 E 143RD CLEVELAND

The borrower is currently working on a cash-out refinance for the property. All the necessary documents have been submitted, so at this point, it’s just a matter of waiting on the lender to move things forward on their end.

42

1234 RUTLEDGE AVE

The whole kitchen’s been fully demoed—cabinets and drywall completely stripped down to the studs, so it’s essentially a full reset. The flooring’s already been sorted, and drywall is up with paint currently in progress. 

43

717 E 6TH MOUNTAIN HOME

The whole kitchen’s been fully demoed—cabinets and drywall completely stripped down to the studs, so it’s essentially a full reset. The flooring’s already been sorted, and drywall is up with paint currently in progress. 

44

4909 OLD ATLANTA

The Closing date is set on Wednesday to Friday this week, marking a major milestone in the process. Everything’s coming together smoothly, and excitement is building as the final steps fall into place. 

45

146 E COURT ST

After speaking with Julie (the borrower), she confirmed that she is wholesaling her project to another flipper. She’s currently working with a realtor to assist with the transaction and is scheduled to meet with both the buyer and the realtor tomorrow.

46

301 E CHURCHWELL AVE

The closing is set for Friday—just around the corner! Everything is finished, and refinancing is in the works. It’s all coming together perfectly, and the goal is within reach. Once the paperwork is wrapped up, everyone will be paid, and the next chapter can begin. Exciting times ahead!

47

160 OAK HILLS DRIVE MABANK TX

The start of the renovation for this fix-and-flip project experienced a brief delay due to a two-week waiting period for documentation to be finalized and signed by Groundfloor. With that administrative step now completed, preparations are underway to initiate construction. 

 

48

916 N FALLON ST

The project is roughly 85% complete, and overall, things seem to be moving at a steady, manageable pace. The borrower is currently waiting on the flooring delivery, which is expected today. If everything arrives on time, they’re aiming to have it fully installed by Friday. 

49

329 N SALFORD ST

The renovation project is currently in the framing stage, with rough-in electrical work underway. Approximately 25–30% of the rehab has been completed to date. All inspections, including electrical and other trades, have been successfully passed, with no permit issues or code violations reported.

50

590 HIGHLAND AVE

The project is nearing the finish line. At this point, most of the heavy lifting is done, with only the cabinets and countertops still left to install. The borrower estimates the rehab is about 90% complete as of today. The goal is to have everything fully finished by the end of June.